What is Pile foundation?
Pile foundation is the type of deep foundation. Pile foundation is mostly depends on the Soil Bearing capacity, Structural Load and Design of the Structure. It is cylindrical in shape. It's length is very deep, depends on the Hard Strata or Hard Rock.
Procedure of Piling work:
Step 1. Boring work:
(a). Bore in Soil/upto to Hard Rock
(b). Bore in Hard Rock
Step 2. Insert the Ms Casing:
(a). Temporary Casing
(b). Permanent Casing
Step 3. Clear the inside mud.
Step 4. Reinforcement work.
Step 5. Concrete Pouring.
Step 6. Remove the Temporary Casing.
Step 7. Excavation for pile Caps or Raft
Step 8. Pile Concrete chipping work - minimum 1m. Or as per drawing.
Step 9. Soiling & Pcc work
Step 10. Reinforcement - Pile Caps & Rafts
Step 11. Concrete Pouring - Pile Caps & Rafts